Another big gap in updates and alot has changed, The day job has been ditched and I'm working for myself at last!
I'm being kept busy which is all good but building cars and engines for everyone else is giving me the itch so I decided to make some time and get this project back on track.
As it stands the car has been sitting around under a cover mostly stripped so I decided to get moving on the next step, chassis prep.
So with the help of Barney from my sponsers, AM PM engineering, I got started removing lots of factory sealer and he got started on stitch welding the frame. This will continue for the next while till be get every seam and then we'll start making the custom roll cage!
So here is a few pics of the progress so far...
Front inner wings..
This is the mess made by the fire extiguisher after we discovered that Nissan had stuffed loads of sponge into the box sections around the inner wing and A pillar, Could have been worse.![]()
In case of any more unexpected sponge we decided to move outside!
Beginning on the floor and door frames inside..
![]()
tasty welding lad watch for the wires there as well![]()
We have all the wires clear alright, Just disn't know there was sponge in there too, Went looking and found loads of the stuff!![]()
proper job man,cant wait to see this car together,gimmi a shout if ya need a hand with anything,i owe ya after wednesday![]()
that pic is very deseeving... get the finger out![]()